12m Self-Propelled-Scissor lift
We received the customer’s inquiry on April 14th. The client is a local company engaged in the production and supply of industrial lifts and material handling equipment. They intend to purchase one self-propelled scissor lift with a platform height of 12 meters.
Platform height:12m
Working height:14m
Load capacity:320kg
Platform size:2270*1110mm
We understand our price is slightly higher than other suppliers. Our core advantages lie in superior workmanship, complete anti-corrosion treatment and reliable overall performance.
The whole machine adopts shot blasting, degreasing, silane treatment, electrophoresis and topcoat painting processes, which greatly improves rust resistance and service life, perfectly adapting to the local climate. Besides,, with stable quality and thoughtful after-sales support.
First Line (Degreasing / Rinsing Stage)
Shot Blasting Machine → (Function: Removes oxide scale and rust from workpieces, improves surface roughness)
Pre-degreasing → (Function: Initially removes oil stains from the workpiece surface)
Degreasing (Immersion) → (Function: Deep soaking degreasing to thoroughly remove oil contaminants)
Rinse 1 (Immersion) → (Function: First immersion rinse to remove residual degreasing agent)
Rinse 2 → (Function: Second rinse for further cleaning)
Deionized (DI) Water Rinse 1 → (Function: First deionized water rinse to remove impurity ions)
Second Line (Silane / Electrophoresis / UF Rinsing Stage – Reverse Flow Process)
Silane Treatment (Immersion) → (Function: Forms a silane film to enhance adhesion and corrosion resistance of the electrophoretic coating)
DI Water Rinse 2 (Immersion) → (Function: Second deionized water immersion rinse)
DI Water Rinse → (Function: Deionized water cleaning)
Cathodic Electrodeposition (CED) (Immersion) → (Function: Cathodic electrophoretic painting to form an anti-corrosive primer layer)
Ultrafiltration (UF) Rinse 1 (Immersion) → (Function: First ultrafiltration rinse to recover electrophoretic paint)
Ultrafiltration (UF) Rinse 2 → (Function: Second ultrafiltration rinse)
Third Line (Post-Electrophoresis Rinsing / Drying / Painting Stage)
DI Water Rinse 4 (Immersion) → (Function: Fourth deionized water immersion rinse)
DI Water Rinse 5 → (Function: Fifth deionized water rinse)
Drainage Area → (Function: Drains water from the workpiece surface)
ED Curing Oven (Bridge Type) → (Function: Bridge-type ED curing oven to cure the electrophoretic paint)
Workpiece Buffer Area → (Function: Workpiece caching area to connect front and back processes)
Dry Spray Booth → (Function: Dry spray booth for topcoat spraying)
Fourth Line (Topcoat Curing / Finished Product Stage)
Curing Oven → (Function: Topcoat curing oven to cure the finish paint)
Finished Product →
The client showed great interest after our introduction and confirmed to place the order with us right away.
We received the official order on April 28th. The client requested delivery to their warehouse by May 1st. On April 29th, we took detailed photos of the goods at the warehouse for the client.
1.Custom Brazilian power socket as per customer’s requirements
2.Pull-out motor system for easy maintenance
3.Test
4.Package