How To Install Goods Lift

Since 1997, XYZLIFT has been at the pinnacle of manufacturing top-quality hydraulic goods lifts. With a rich legacy spanning over 12 years, we are here to demystify the installation process for you. Here’s a comprehensive guide, crafted meticulously to suit your needs.

Table of Contents
    Add a header to begin generating the table of contents

    Step 1: Getting to know each goods lift parts

    Guardrail rail

    Guide Rail

    1 of 9
    Platform

    Platform

    2 of 9
    Cylinder

    Hydraulic Cylinder

    3 of 9
    Pump station

    Power Pack

    4 of 9
    Controller

    Control Panel

    5 of 9
    Limited Switch

    Limit Switch

    6 of 9
    Chain and Steel rope

    Lifting system

    7 of 9
    Oil pipe

    Lifting system

    8 of 9
    Limited switch touch

    Lifting system

    9 of 9

    Main parts are assembled well, such as chain and safety steel rope, and the electric wire are connection well, so the installtaion work is so easy. Now Let’s see which parts you will received.

    Parts 1: Goods lift platform.

    Parts 2: Goods lift guardrail.

    Parts 3: Electric box and controller.

    Step 2: Move the goods lift platform to installation site.

    Ensure that the installation site’s ground is level and free of debris. And move the platform to the instllation site. Make sure not to place the platform in the wrong direction. We marked A,B,C,D side. Generally,ground floor door open is C side. D side are first floor door open side. A side is with limited switch touch. 

    Step 3: Connect the guardrail by bolt, and weld them together. A to A, B to B. 

    B

    Guide Rail

    1 of 1
    B

    Guide Rail

    1 of 1
    B

    Guide Rail

    1 of 6
    Connection

    Platform

    2 of 6
    Connection

    Platform

    3 of 6
    B

    Hydraulic Cylinder

    4 of 6
    B

    Hydraulic Cylinder

    5 of 6
    B

    Hydraulic Cylinder

    6 of 6
    A

    Guide Rail

    1 of 6
    Connection

    Platform

    2 of 6
    Connection

    Platform

    3 of 6
    A

    Hydraulic Cylinder

    4 of 6
    A

    Hydraulic Cylinder

    5 of 6
    A

    Hydraulic Cylinder

    6 of 6

    Step 4:Set up the guardrail and plug them into the platform.

    1.Put two pcs of base plates under platform wheel, there are for fixed the guidrails to the ground. 

    2. Hang up the guardrail, and plug the guardrail into the platform,  platform wheels slid in the guardrail. Please note that A guardrail insert into platform A side, B guardrail insert into platform side B

    Remark: Do Not fixed the gauardrail to the base plates or to the wall.

    3. Adjust the guardrail are vertical, it is very imporant. Check it by level meter.

    4. Fixed the guardrail to the ground and wall temporary. Because we need adjust lift again after goods lift installation. 

    Step 5: Fixed the chains and wire ropes on platform.

    Fixed the chain and rope to platform. 

    Step 6: Fix limited switch on the guide rail at correct position on each floor level.

    Fix limited switch on the guide rail at correct position on each floor level.

    Limited switch function: When limited swith touch it, platform will stop. So the limited switch is fixed on correct floor height. 

    1F: First floor limited switch

    2F: Second floor limited switch

    3F: Thrid floor limited switch

    FF: Final limited switch.It will fixed up the final floor limited switch. If final limited switch is damaged, final limited switch will work, prevent goods lift platform lift up to higher height. 

    We marked details on limited switch, and showed fixed placed on guardrail for limited switch.

    Limited switch installation method picture for reference.

    Limited switch touch

    Step 7: Pump station connection.

    5.1 Add hydarulic oil.

    5.2 Connect hydraulic oil pipe to hydraulic cylinder.

    Step 8: Electric box connection.

    8.1 Electirc wire we marked the number CF and A. Please connect them accordingly.

     

    Wire CF and connect CF on the pump station. This wire is for overload pressure and warning. Pressure gage already set correctly.

    Wire A connecto to wire A underplatform. This wire for platform door interlock, door open, lift do not work. Only closed platform door, lift will be work.

    8.2 Motor power connect to electric box.

    8.3 Connect the local power to electric box. 

    Step 9: Test goods lift without load.

    We need do below work before fixed guardrail enduringly.

    1. Add lubricate on guardrail. Lubricate is supplied by XYZLIFT.
    2. Check goods lift platform at right level.
    3. Test goods lift 3 times without load.
    4. Confirm the guardrail are vertical again. 

    Step 10: Fixed the guardrail enduringly

    1. Fixed the guardrail by bolt to the ground.
    2. Fixed the guardrail to the wall or mezzanine floor.

    Remark: Bolt and fixed material are supplied by XYZLIFT.

    Send A Messange

    We will promptly respond to your inquiry within 8 hours to provide the necessary information and support.

    Author:April Zhao

    Title: Sales Manager of XYZLIFT

    Profile:At the helm of hydraulic lift innovation and sales at XYZLIFT since the distinguished year of 2011.

    Ask For A Quick Quote

    We will contact you within 1 working day, please pay attention to the email info@xyzlift.com

    Or contact us by whatsapp +86-18366130656

    × Contact us now